With the construction of the Belt and Road Initiative, more and more Chinese companies are undertaking overseas engineering projects. BSC was honored to provide a full set of anti-corrosion coatings for the Dubai Palm Island musical fountain project (this fountain is the second largest fountain in the world). This project is sponsored by The Chinese company undertook it, partially painted it in China and shipped it to Dubai, where it was repaired.
This project also uses BSC's patented technology of rust-free polysulfide epoxy coating, which simplifies the original 6-layer construction to 2 layers and achieves an anti-corrosion life of more than 15 years.
During the installation of the project when it was flooded in Dubai, there was a collision problem during the hoisting process. After the project entered the water, at the owner's request, BSC provided special coatings for underwater construction and underwater curing, helping the owner solve the problem of underwater repair. Project Overview Fountain completed status Painting construction process